Answers are grounded in this paper and cite their sources.
An integrated long-term scheduler (LTS) for a GENCO with local transmission lines and numerous constraints is proposed. The proposed algorithm extends the Benders decomposition to include network, fuel and emission constraints into LTS. The local network is modeled as a probabilistic problem to include the effect of generation and transmission outages. The proposed algorithm will be used by GENCO planners and ISO for ATC calculations.
No takes yet. Share an insight, caveat, or question.
Marwali et al. (1999) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: