Answers are grounded in this paper and cite their sources.
The Facilities Manager occupies a unique position within the lifecycle of a building asset, as he/she is one of the only Architecture/Engineering/Construction (AEC) and Facilities Management (FM) professionals who is in a position to view the product of the entire design and build process and is responsible for the operational phase which incurs approximately five times the initial capital cost. Despite the potential benefits that the Facilities Manager offers, this profession still does not command the recognition it deserves within the AEC/FM sector. This is beginning to change through the introduction of Building Information Modelling (BIM). In order for the BIM process to be maximised it is imperative that the Facilities Manager plays a much more important role within the design and construction process. Despite this, at present the role of the Facilities Manager within this process is still uncertain with no set Key Performance Indicators (KPI) or role designation being specified to date. This paper outlines how the Facilities Manager can play a pivotal role in the BIM process and, in particular, will aim to establish the basis for a number of KPIs by Facility Managers which will in turn lead to a more robust Lean FM practice.
No takes yet. Share an insight, caveat, or question.
McAuley et al. (2013) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: