Answers are grounded in this paper and cite their sources.
This paper presents a solution algorithm for expansion planning in distribution systems in which fault cases are taken into consideration. The proposed method can take all the predetermined severe fault cases into consideration simultaneously, and can avoid installing excess facilities without affecting the ability for fault restoration. In the algorithm, the whole problem is decomposed into sub-problems according to pre-determined fault cases, and is efficiently solved by using the branch exchange algorithm and the decomposition-coordination technique. The validity and the effectiveness of the proposed algorithm are demonstrated by numerical examples.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
No takes yet. Share an insight, caveat, or question.
Nara et al. (1994) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: