We describe a system for forecasting flood risk in the 370 km2, largely urban Kifissos Basin, Athens, Greece, located in moderate to steep terrain (∼3 h hydrologic response time). A 42 h flood forecast lead time is achieved through the use of an integrated hydro-meteorological system. Rainfall is forecast, on a 6 km grid, with a chain of nested numerical weather prediction models, consisting of a limited area model initialized with results of a global circulation model. Flood risk is assessed by driving a hydrologic model with the forecasted rainfall. The system’s forecast skill is evaluated for two recent, medium-size storm events. Results are encouraging for this initial operational stage, however, they also indicate that integrated hydro-meterological models are not yet mature tools. The weaker part of flood risk assessment is the rainfall forecast, which underestimated cumulative depths and maximum intensities and overestimated duration.
No takes yet. Share an insight, caveat, or question.
Koussis et al. (2002) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: