Answers are grounded in this paper and cite their sources.
The component lifecycle of fusion power plants is key to their commercial availability. While the compact nature of spherical tokamaks can help reduce costs and provide benefits to the plasma performance, the restricted inboard build presents challenges to both component lifetimes and maintenance. In this paper we detail a new availability model for spherical tokamaks, we then use this model as part of a Monte Carlo sensitivity analysis where we vary the time to replace components, as well as parameters which impact component lifetimes. From the results, we assess the trade-offs between these and plant availability and costs. We also make some statements about targets for these parameters to maximise the availability of commercial fusion power plants. • Frequency of component replacement impacts availability. • Commercial fusion power plants will require longer component lifetimes. • Monte Carlo results show interplay between cost, availability and lifetimes. • Commercially relevant availabilities are achievable with high performing components.
No takes yet. Share an insight, caveat, or question.
Foster et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: