Answers are grounded in this paper and cite their sources.
We study the use of flow‐based algorithmic and proof techniques applied to preemptive scheduling of jobs on parallel identical machines. For the classical problem in which the jobs have individual release dates and must be finished by a common deadline, we present and prove unified necessary and sufficient conditions for the existence of a feasible schedule by examining the structure of minimum cuts in a special network. We then study an enhanced model that allows the presence of additional resources, provided that some jobs at any time of their processing require one unit of a particular resource. We extend our argument developed for the classical case to this enhanced model. The generalized necessary and sufficient conditions for the existence of a feasible schedule are presented and proved using the max‐flow/min‐cut reasoning.
No takes yet. Share an insight, caveat, or question.
Shioura et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: