Answers are grounded in this paper and cite their sources.
The system of construction design completion most frequently used in Poland is the traditional one. In this system, the client describes the subject of the order by means of design documentation and technical specifications of construction and commissioning of building works. The article analyses the most frequent errors that appear in design documentation, discusses the reasons for their occurrence and specifies their possible consequences.
No takes yet. Share an insight, caveat, or question.
Juszczyk et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: