Answers are grounded in this paper and cite their sources.
The paper observes the solution for the problem of asphaltene-resin-paraffin deposits removing by modification of the oil well tubing and the paraffin removal process. Authors obtained the initial heating function; implemented mathematical modeling of the process under various conditions, carried out the analysis of the obtained results. Authors developed hardware and software system in Pascal programming language using the obtained controller. The system enables to model the behavior of temperature fields in the isotropic rod. The practical results of the studies allow concluding that it is possible to build oil well tubing with pulsed heating sources for paraffin removal process in low production rates wells.
No takes yet. Share an insight, caveat, or question.
Ilyushin et al. (2019) studied this question.