This is the authors' abstract. We don't add key points for this paper.
The problems of minimizing the expected makespan and minimizing the expected tic for a finite set of independent tasks with exponential service-time distributions on m ~ 2 it processors are considered. It is shown that a scheduling policy minimizes the expected flow timq only if it is shortest expected processing time tint, and that a policy minimizes the expected make and only if it is longest expected processing time fast.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Bruno et al. (1981) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: