Answers are grounded in this paper and cite their sources.
Recent information systems are evolving and starting to have reconfigurable structures that enable rapid implementation and maintenance. Simulation-based planning and scheduling approaches are considered to be suitable for this trend, because they utilise simulations as decision-support tools composed of simulator, simulation models and experimental frames, and these components can be modularised easily according to their functionalities. To implement a simulation-based planning and scheduling system, we have designed workflows for basic structures of the system and a workflow management system that can be used as a platform on which various Web services and Business rules can be integrated. We have described the technical requirements and presented how to resolve them. As a case study, a production planning system is developed in the workflow-based manner along with the classical method as a control group; we have done a comparative performance evaluation between the two methodologies. This case study demonstrates that the proposed workflow-based approach is able to minimise system development efforts and maintain high enough performance to apply the approach in real life.
No takes yet. Share an insight, caveat, or question.
Lee et al. (2011) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: