Answers are grounded in this paper and cite their sources.
This paper presents an extensive performance analysis of dispatching rules for dynamic scheduling in one-of-a-kind production (OKP) where each job has its own due-date and multilevel routing structure. For the analysis, a framework of dynamic dispatching rules is proposed to identify five dispatching rules: job due-date (JDD) rule, normalized JDD rule, latest finish date (LFD) rule, latest start date (LSD) rule, and refined LSD rule. The performance analysis shows that: (i) JDD, LFD and LSD rules perform fairly well, which is compatible with the results of existing studies; (ii) the refined LSD rule outperforms other rules; (iii) the normalized JDD rule performs very poorly. Also presented is a framework of simulation-based dynamic scheduling in which the refined LSD as well as the 'try-every-rule' approach can be effectively utilized.
No takes yet. Share an insight, caveat, or question.
Choi et al. (2006) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: