The electric power industry all over the world is undertaking major regulatory and operational changes. The understanding of power supply as a public service is being replaced by the notion that competitive markets constitute a more appropriate framework to supply reliable, and cheap electric energy to consumers. As mandated by FERC orders 888 and 889, this paper considers simultaneously energy, AGC, and reserve markets in a pool framework. It provides a tool to enable a power generator to determine optimally its degree of involvement in each one of these markets. A real-world case study is analyzed and results are presented.
No takes yet. Share an insight, caveat, or question.
Arroyo et al. (2002) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: