Answers are grounded in this paper and cite their sources.
The electric power industry all over the world is undertaking major regulatory and operational changes. The understanding of power supply as a public service is being replaced by the notion that competitive markets constitute a more appropriate framework to supply reliable, and cheap electric energy to consumers. As mandated by FERC orders 888 and 889, this paper considers simultaneously energy, AGC, and reserve markets in a pool framework. It provides a tool to enable a power generator to determine optimally its degree of involvement in each one of these markets. A real-world case study is analyzed and results are presented.
No takes yet. Share an insight, caveat, or question.
Arroyo et al. (2002) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: