Modeling study demonstrates up to 92% accuracy in predicting tire manufacturing sequences using deep learning, highlighting digital twin integration for production scheduling.
Production sequencing methodology using DeepLearning Seq2Seq-LSTM is applied to a tire production case study in Quebec, Canada. Production and demand data are used to predict the most likely product sequences to operate. The comparison of 4 forecasting models, differing in consideration of demand and a statistical component, leads to nearly 70% of good prediction when all machines are studied and 10 production scenarios are considered. This performance reaches 92% for a specific class of machines. The analysis of the forecasts by class of machine allows highlighting 2 factors influencing the performance of the models, namely the ratio of product/machine by class and the total number of available records. The forecasts of possible production scenarios can then be used in a digital twin to evaluate a reasonable number of options and develop a decision support system for production sequencing.
No takes yet. Share an insight, caveat, or question.
Dupuis et al. (2023) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: