Answers are grounded in this paper and cite their sources.
Recent research studies of job shop scheduling have begun to examine the interaction between sequencing priorities and the method of assigning due-dates. This paper surveys the tactical aspects of this interaction, focusing primarily on average tardiness as a measure of scheduling effectiveness. The discussion highlights several factors that can affect the performance of dispatching rules, such as the average flow allowance, the due-date assignment method, and the use of progress milestones. A set of simulation experiments illuminates how these factors interact with the dispatching rule, and the experimental results suggest which combinations are most effective in a scheduling system.
No takes yet. Share an insight, caveat, or question.
Kenneth R. Baker (1984) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: