Answers are grounded in this paper and cite their sources.
In research involving the evaluation of organizational changes, it is rarely possible to obtain the desired experimental controls. A number of possible “patch-up” designs are discussed.
No takes yet. Share an insight, caveat, or question.
Martin Evans (1975) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: