This paper considers an electricity pool that includes a significant number of wind producers and is cleared through a network-constrained auction, one day in advance and on an hourly basis. The hourly auction is formulated as a two-stage stochastic programming problem, where the first stage represents the clearing of the market and the second stage models the system operation under a number of plausible wind production realizations. This formulation co-optimizes energy and reserve, and allows deriving both pool energy prices and balancing energy prices. These prices result in both cost recovery for producers and revenue reconciliation. A case study of realistic size is used to illustrate the functioning of the proposed pricing scheme.
No takes yet. Share an insight, caveat, or question.
Morales et al. (2012) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: