Productivity measurement is a concern for both construction practitioners and researchers. In construction, productivity can be measured at three levels: activity, project, and industry. At the project level, previous studies focused on measuring the productivity of specific activities. In addition, existing project-level productivity metrics do not consider the effect of all resources used in a project. To effectively assess overall project performance, the productivity of all project activities and resources used must be taken into account. This study presents a framework that takes into consideration all resources used in a project and proposes a metric for measuring the total productivity of construction projects. A focus group session with experts, followed by questionnaire surveys, were used to assess the applicability of the framework. This paper makes a contribution by providing researchers and practitioners with a framework and tools for data collection and analysis of total construction project productivity.
No takes yet. Share an insight, caveat, or question.
Ayele et al. (2019) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: