Answers are grounded in this paper and cite their sources.
Validation of site models against recorded field data is critical to ensure the models accurately reflect the response of the site. Without such validation, the models cannot be considered reliable and can have adverse effects on any larger model into which they are integrated. Additionally, as an increasing number of inverter-based resources are connected to the grid, it is becoming evident that ElectroMagnetic Transient (EMT) as well as positive sequence models must be developed and verified. This paper demonstrates the verification process for positive sequence and EMT models using a 200MW solar site as an example. The site operates in Voltage Control Mode (VCM). Staged testing performed at the site consists of a small voltage step applied at the Plant Controller (PC) setpoint. The field data is used to verify the response of an aggregated positive sequence model of the site by comparing the recorded response to the model response when the same voltage step was applied in the model. The verified positive sequence model is then used to verify the aggregated EMT model of the site. This is similarly achieved by comparing the responses of the two models in flat run and fault simulations.
No takes yet. Share an insight, caveat, or question.
Esmaily-Radvar et al. (2021) studied this question.