Schedules of complex civil engineering construction projects are dealt with. Complexity of the projects results from numerous factors. They include precedence relations between technological operations and multiple modes of their execution, limited availability of resources. Above mentioned factors cause that there usually appear numerous feasible construction project schedule alternatives. The choice of the best project schedule alternative requires application of mult i-criteria decision analysis. Applied criteria usually pertain to time and cost of project execution, utilisation and nature of available resources etc. Utilisation of other, intangible, criteria due to influence of building activities on surrounding environment is also recommended. An intangibility-aware approach for multi-dimensional evaluation of construction project execution is presented. It is based on assessment of technological operation modes using a pairwise AHP/ANP comparisons. Discussion of results of initial application of the approach is also included.
No takes yet. Share an insight, caveat, or question.
Tomasz Wojtkiewicz (2011) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: