The public-transport (transit) operation planning process commonly includes four basic activities, usually performed in sequence: network design, timetable development, vehicle scheduling, and crew scheduling. This work addresses two activities: timetable development and vehicle-scheduling with different vehicles types. Alternative timetables are constructed with either even headways, but not necessarily even passenger loads or even average passenger loads, but not even headways. A method to construct timetables with the combination of both even-headway and even-load concepts is developed for multi-vehicle sizes. The vehicle-scheduling problem is based on given sets of trips and vehicle types arranged in decreasing order of vehicle cost. This problem can be formulated as a cost-flow network problem with an NP-hard complexity level. Thus, a heuristic algorithm is developed. A few examples are used as an expository device to illustrate the procedures developed.
No takes yet. Share an insight, caveat, or question.
Avishai Ceder (2011) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: