Examines resilient planning to enhance microgrid formation in distribution systems, suggesting improved safety measures.
Power distribution system is vulnerable to natural disasters, when natural disasters occur, its resilience can be improved by formation of MGs. However, unsafe unplanned islands may trigger cascade shedding of DGs, leading to the failure of forming MG. Therefore, a new resilient investment planning method for distribution systems is proposed in this paper, which not only considers the static safe operation constraints before and after random accidents, but also incorporates the transient island safety constraints. The problem is formulated as a two-stage stochastic programming model with transient constraints. Since the problem cannot be solved directly, a simulation-assisted artificial intelligence method is proposed, in which frequency response simulation under stochastic interrupt of distribution system is built, and an extreme learning machine-based method is used to extract the relationship between the interrupted line power and the lowest frequency of the formed MG. Then it is embedded into the optimization problem. The proposed model and method are verified by a 37-node distribution system to demonstrate its superiority.
No takes yet. Share an insight, caveat, or question.
Qi et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: