Answers are grounded in this paper and cite their sources.
A growing number of stationary lead-acid battery installations are reaching the limits of their service life. In order to safely extend their service life, computer based battery testing and monitoring systems have been used successfully to determine the capacity without subjecting the battery to a complete discharge, as would normally be the case in standard practice. This paper describes the technical issues surrounding the test equipment and the methodology. Test results from over 8000 cells are presented, along with a case study showing how the service life of an aging battery was extended by two years.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
No takes yet. Share an insight, caveat, or question.
Lee et al. (2005) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: