Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem

View Full Paper
CLChung‐Yee LeeTCT.C.E. ChengBLBertrand M.T. Lin

Key Points

Key points are not available for this paper at this time.

Abstract

This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, we present a proof to show that the general version of this problem is strongly NP-complete. We then discuss a few polynomially solvable cases of the problem and present the solution algorithms. Next, a branch and bound solution scheme is suggested. Finally, three heuristics to find approximate solutions to the general problem are proposed and their error bounds are analyzed.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Lee et al. (1993) studied this question.

synapsesocial.com/papers/6a20e685f76165bc1becc584https://doi.org/10.1287/mnsc.39.5.616
Ask AI
Helpful
Bookmark
Share
View Full Paper