Piping engineering, which involves a plenty of materials and has a large-scale construction work quantity, is an important part of chemical engineering, and how to make a good cost control of it is very important for the success of chemical project. Based on the Cybernetics and Systems science, this paper has established a whole process covered cost control model and proposed the control system for the piping engineering, and the related control strategies have been also proposed on this basis. Finally, combined with some cases, this paper analyzed the application of the whole process covered cost control methods in the chemical piping engineering.