Answers are grounded in this paper and cite their sources.
Capital constraints, regulatory pressure and increased economy transfers between companies have prompted increased loading of the interconnected transmission and distribution systems. The goal of a Reactive Management Program is to improve the utilization of the interconnected transmission and distribution systems, and provide reliable and low cost service to customers. This paper describes a method to develop a Reactive Management Program. Also included is a description of a system using this philosophy that performed efficiently during an extreme operating condition in June of 1989.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
No takes yet. Share an insight, caveat, or question.
Nedwick et al. (1995) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: