Los puntos clave no están disponibles para este artículo en este momento.
Abstract This article examines the influence of both production rate and learning on airframe program costs. A dynamic multiple‐output production model is developed and is used to observe the cost impact of changes in production rate and learning. Several simulations are performed to demonstrate the sensitivity of the optimal time path of cost to changes in the model parameters. The model is applied by estimating parameters from the F102 airframe program.
Gulledge et al. (Thu,) studied this question.