A direct method is introduced for minimizing the shift of generation required to meet temporary operating criteria, such as the elimination of overload lines or transformers, or fixed flows on inter-ties or critical lines. Also, a linear model for multiple contingencies is presented.
No takes yet. Share an insight, caveat, or question.
Daniels et al. (1972) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: