Key points are not available for this paper at this time.
Abstract In the first part of this review 62 we described the characteristics of semiconductor manufacturing environments and reviewed research on system performance evaluation and production planning. In this paper we focus on shop-floor control problems. We classify research to date by the solution techniques used, and discuss the relative advantages and disadvantages of the various approaches. We discuss the relationship between shop-floor control and production planning and suggest future research directions.
Uzsoy et al. (Thu,) studied this question.