Some isolated microgrids supply electricity for multiple pulsed loads, which consume tremendous energy in a short period. Usually, it is hard for an isolated microgrid to maintain stable when serving many pulsed loads directly and randomly. This paper proposes a novel energy supply strategy under some operational constraints in a single-bus microgrid from load perspective. Firstly, the charging circuit with supercapacitors before pulsed loads is presented. Then, an optimization model is introduced, which maximizes the power supply utility in a specified period by adjusting the charging process of energy storage system. Furthermore, three kinds of operational constraints are considered: the upper and lower bounds of times for pulsed loads supply, the non-constant upper bound of total charging power, and the completeness of charging process. Particle swarm optimization algorithm is used to find an optimal strategy. A case with 8 pulsed loads shows the efficacy of the proposed model and algorithm.
Building similarity graph...
Analyzing shared references across papers
Loading...
Rui Xie
Zhejiang Chinese Medical University
Ying Chen
Shanghai Jiao Tong University
Fan Li
Sun Yat-sen University
Tsinghua University
Building similarity graph...
Analyzing shared references across papers
Loading...
Xie et al. (Wed,) studied this question.
synapsesocial.com/papers/6a22bd2060296ba93ed2ce0e — DOI: https://doi.org/10.1109/pesgm.2018.8586252