Answers are grounded in this paper and cite their sources.
The present paper offers a novel solution to the timetable rescheduling problem of a subway network during the end-of-service period. Based on the complex transfer connections between multiple trains at different lines, we propose a passenger-oriented timetable rescheduling model with the consideration of transfer coordination. On the one hand, we try to maximize the number of successful transfer passengers. On the other hand, we attempt to minimize the average transfer waiting time of successful transfer passengers. As a NP-hard problem, an efficient genetic algorithm is designed to solve the problem of a large-scale and complex network. Finally, a case study of the Beijing subway network is used to verify the proposed method.
No takes yet. Share an insight, caveat, or question.
Xu et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: