Answers are grounded in this paper and cite their sources.
This article intends to present a metaheuristic-based methodology to design energy optimal railway timetables so as to maximize overlapping time between speed up and slow down phases of trains. After a presentation of an electrical modeling of a metro line, a nodal analysis based on Newton-Raphson solving technique is introduced to determine electrical power flows inside the network. Then a particle swarm optimization and a genetic algorithm are implemented to define timetables that will maximize braking energy recovery. Finally, a simulation is performed to compare a nominal timetable and a timetable found by previous metaheuristics. Results show promising energy saving on an operational day.
No takes yet. Share an insight, caveat, or question.
Lesel et al. (2016) studied this question.
Synapse has enriched 7 closely related papers on similar clinical questions. Consider them for comparative context: