Answers are grounded in this paper and cite their sources.
The effect upon the cost is considered when the unavailable states of a linear plant are estimated with a linear observer and the estimates are used in the feedback control.
No takes yet. Share an insight, caveat, or question.
M. M. NEWMANN (1969) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: