Randomized trial investigates zinc removal and iron enrichment in cold-bonded briquettes, suggesting effective resource utilization.
High-zinc blast furnace dust is a zinc-bearing solid waste generated during ironmaking. Efficient de-zincing and iron enrichment are required for its resource utilization. This study investigated the high-temperature reduction behavior and kinetic transition mechanism of cold-bonded briquettes made from high-zinc blast furnace dust with a small addition of iron ore powder, with particular emphasis on the effects of reduction temperature (1000–1200 °C) and holding time (10–60 min). The results show that reduction at 1200 °C for 60 min can effectively remove zinc and enrich iron. The de-zincing rate reached 92%, and the TFe grade increased to 50 wt.%, achieving the goal of efficiently removing zinc while improving the TFe grade of the reacted briquettes. During the middle and later stages of reduction (1100–1200 °C, 30–60 min), the content of newly formed metallic iron increased, which restored the briquette strength to 524 N after reduction. In addition, the reduction kinetics of the system evolved from interfacial chemical reaction control in the initial stage to three-dimensional internal diffusion control in the middle and later stages. These results provide a theoretical basis and technical reference for the resource utilization of high-zinc blast furnace dust.
No takes yet. Share an insight, caveat, or question.
Wei et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: