Randomized trial demonstrates improved production rates in earthmoving logistics, suggesting efficient dispatching strategies.
Truck-to-excavator assignment is a time-critical control problem in open-pit earthmoving systems (mines, quarries, and large cut-and-fill construction sites) where stochastic travel and service times, changing queues, and equipment outages continually alter the best dispatch decision. A deep reinforcement learning (DRL) dispatch policy is developed and trained using a discrete-event simulation (DES) digital twin of the Sungun copper mine haulage system. The dispatch task is formulated as a Markov decision process using state features that represent fleet locations, excavator and dump queues, and short-term congestion conditions. The resulting deep artificial neural network (DANN) policy is tuned via systematic hyperparameter optimisation and evaluated against a priority-based rule-of-thumb dispatch baseline under long-horizon operating tracks. Results show that the final trained policy improves the average production rate per truck cycle by approximately 17% while reducing avoidable waiting and maintaining stable performance over extended operation, with inference fast enough for real-time dispatch use. Model fidelity is supported by close agreement between simulated and observed daily completed-cycle counts. Robustness is assessed through controlled truck load-capacity perturbations, and scalability is examined through fleet-size sensitivity, which reveals diminishing returns as additional trucks are added under a fixed excavation–haulage configuration. Practical deployment considerations and implications for construction earthmoving logistics are discussed.
No takes yet. Share an insight, caveat, or question.
Hatami et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: