Answers are grounded in this paper and cite their sources.
Objective: This study aimed to determine whether on ultra-long range (ULR) flights, perceived workload is an independent predictor of cabin crew fatigue at top-of-descent (TOD) and if so, to what degree it is associated with cabin crew fatigue relative to sleep-related factors.Background: Current ULR scheduling for cabin crew is predominantly based on flight crew data. However, cabin crew workload is very different in nature to that of flight crew.Method: Fifty-five cabin crew wore an actigraph and completed a sleep/duty diary to monitor sleep during a ULR trip. At TOD, crewmembers completed a 5-min Psychomotor Vigilance Task (PVT), rated their sleepiness (Karolinska Sleepiness Scale) and fatigue (Samn-Perelli Crew Status Check), and after landing their workload (NASA Task Load Index).Results: When workload was perceived as higher, crewmembers felt more sleepy and fatigued and had more PVT lapses at TOD. The effect of workload on sleepiness was larger (Cohen’s ƒ2 = .27) than the duration of wakefulness (Cohen’s ƒ2 = .14), but the effect of workload on fatigue (Cohen’s ƒ2 = .17) was smaller than the duration of wakefulness (Cohen’s ƒ2 = .24). Lapses were not associated with sleep history, whereas workload had a small effect (Cohen’s ƒ2 = .14).Conclusion: Workload as a fatigue factor for cabin crew warrants ongoing monitoring. This can be achieved by including a workload question in fatigue reports as an essential component in Fatigue Risk Management Systems.
No takes yet. Share an insight, caveat, or question.
Berg et al. (2019) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: