Our ability to analyze and compute 2D and 3D factors of safety for embankments and slopes, including finite element and finite difference analyses, has increased greatly in the last decade. But these numerical methods require good understanding and accurate modeling of the driving and resisting stresses, as well as the subsurface conditions that affect them. In particular, design engineers should understand the link between loading the top of a slope, excavating along its toe, and the timing of both. This article presents a coastal geotechnics case history where a lack of understanding about these links produced unacceptable consequences during the attempted construction of a wharf and an access rockfill causeway.