This paper proposes an efficient approach for probabilistic transmission expansion planning (TEP) that considers load and wind power generation uncertainties. The Benders decomposition algorithm in conjunction with Monte Carlo simulation is used to tackle the proposed probabilistic TEP. An upper bound on total load shedding is introduced in order to obtain network solutions that have an acceptable probability of load curtailment. The proposed approach is applied on Garver six-bus test system and on IEEE 24-bus reliability test system. The effect of contingency analysis, load and mainly wind production uncertainties on network expansion configurations and costs is investigated. It is shown that the method presented can be used effectively to study the effect of increasing wind power integration on TEP of systems with high wind generation uncertainties.
No takes yet. Share an insight, caveat, or question.
Orfanos et al. (2013) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: