Assesses deformation monitoring in large dam projects, highlighting improved safety and risk management.
This research presents an integrated real-time geotechnical monitoring framework for the Diamer Basha Dam Project, combining UAV photogrammetry, GNSS networks, total station surveys, GIS-based deformation mapping, and geotechnical instrumentation (piezometers, inclinometers, extensometers, and crack meters). The research assesses excavation-induced deformation, blasting impacts, groundwater pressure fluctuations, and slope stability under complex geological conditions. Results show that the integrated approach enhances deformation prediction, improves slope safety evaluation, and supports effective risk management during the construction of large RCC dam projects.
No takes yet. Share an insight, caveat, or question.
Engr. Quarib Ullah (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: