Answers are grounded in this paper and cite their sources.
Demonstrates void-free polysilicon filling in trenches, indicating improved doping methods.
In this paper, a discontinuous supply of doped gas (phosphine (PH₃)) was proposal to enable the polysilicon reproduction of the bottom-up filling of the trenches.By systematically investigating the relationship between PH₃ flow rate and the deposition rate of polysilicon, the study elucidates the physical mechanism behind void formation in trenches under the conventional continuous gas supply mode.An innovative discontinuous gas supply method was employed, where PH₃ was introduced into the reaction chamber in stages, successfully achieving void-free filling of polycrystalline silicon films in trench structures with an aspect ratio of 10:1.The concentration of doped gas PH3 at the trenches bottom was lower than the top during the polysilicon deposition by the fire-new method.The results from scanning electron microscopy showed a void-free polysilicon filling in trenches significantly.
No takes yet. Share an insight, caveat, or question.
Shengbin Zhang (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: