Develops a model to optimize project schedules, aiming to enhance efficiency in complex environments.
Considering duration, cost, and quality constraints, this study develops a multi-objective optimization model for project scheduling. The framework employs trapezoidal fuzzy numbers to characterize activity durations and a bell-shaped function to define the duration-quality trade-off. An optimal schedule is derived using a genetic algorithm. To mitigate uncertainties in construction progress, four duration risk categories—resource, operational, human, and environmental—are quantified through risk coefficients and weighting factors to establish a robust buffer sizing mechanism. Upon 50% completion of the planned workload, a grey GM(1,1) model is implemented to forecast activity finish times based on real-time progress monitoring. Furthermore, a dynamic buffer allocation model is established by integrating initial buffers, early completion gains, and cumulative buffer consumption. Application to a pumped storage power station project demonstrates that the proposed method reduces the total duration by 18 days, confirming its efficiency and practical utility in complex engineering environments.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: