Experimental investigation assesses a new wetland system's efficiency in treating domestic wastewater, indicating significant pollutant removal.
The growing urbanisation of India is a major contributor to the production of 72,368 million litres of wastewater daily. Unfortunately, not even 28 to 31% of the generated wastewater receives proper treatment before disposal, putting public health, water quality, and ecological conditions at risk. Traditional wastewater treatment technologies have been proven effective, but they cannot be applied in decentralised settings due to excessive initial investment costs, continuous power needs, and the need for expert supervision. Constructed wetlands (CWs) provide an efficient and environmentally friendly option for decentralised treatment, but these systems suffer from a gradual loss of effectiveness associated with the problem of media-clogging in traditional setups. This research investigates the functioning and efficiency of the Modified Towery Bio-rack Constructed Wetland (MTBRCW) technology designed specifically to mitigate media-clogging issues. The MTBRCW is tested on the basis of its performance under continuous operating conditions for thirteen months (January 2025 to January 2026), as well as on the effectiveness of the treatment at eight different hydraulic retention times (days 1 to 8). A pilot-scale MTBRCW system was monitored through two periodic sampling events (S1 and S2) conducted during each month of operation. The pilot-scale MTBRCW unit is made up of an inlet storage tank (volume 0.099 m3) followed by two wetland containers (volume 0.034 m3 each) planted with Typha angustifolia and Chrysopogon zizanioides (vetiver grass). In continuous testing mode, influent–effluent paired samples are collected for eight days at each HRT (totalling eighty samples), and samples are analysed according to APHA Standard Methods for pH, BOD, COD, TN, and TP. In continuous testing mode, the MTBRCW exhibits high removal efficiencies at the levels of 89.8% for BOD, 87.5% for COD, 78.2% for TN, and 74.4% for TP. The BOD/COD of the effluent was within the prescribed CPCB discharge limits for all thirteen months of the study, and the TN levels were adhered to in 12 out of 13 months, with one non-compliance event recorded only in July 2025 (effluent TN = 10.8 mg/L), coinciding with the peak monsoon hydraulic loading rate of 0.28 m3/m2·d. TP remained within CPCB limits in all thirteen months. In batch testing mode, removal efficiencies are 94.9% for BOD and 89.9% for COD by day 8. In addition, there were no indications of clogging or any reduction in hydraulic performance during the entire period of the tests through the use of visual inspections and measurement of the outlet flows, but this can only be seen as an observation in a field operation, and not as proof of the hydraulic performance of the system, since no tracer test or measurement of hydraulic conductivity was conducted.
No takes yet. Share an insight, caveat, or question.
Lokhande et al. (2026) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: