Randomized trial evaluates economic benefits of performance-based fire design in high-rise modular buildings, suggesting valuable cost insights.
As steel modular construction expands into high-rise developments, prescriptive fire protection standards impose a critical economic barrier. This study proposes a decision-support framework for early-stage economic evaluation of Performance-Based Fire Design (PBFD) in high-rise steel modular buildings. Structural analysis was extended to 14 configurations spanning 13 to 33 stories, and a direct construction cost model was applied across all configurations. PBFD delivers its greatest economic value within the 13-to-18-story “Opportunity Zone,” where prescriptive requirements are substantial but structural load ratios remain sufficiently moderate, yielding unit savings of 78,000–84,000 KRW/m². Beyond this range, savings decline non-linearly as cumulative gravity loads erode PBFD advantage. Horizontal plan expansion exhibits high cost-inelasticity, suggesting that unit savings indices are transferable across similar plan configurations. Column section enlargement increases fire protection savings but incurs height-dependent steel cost penalties, underscoring the importance of integrated cost evaluation. The framework provides construction managers and project owners with a quantitative basis for preliminary Go/No-Go economic judgment at the early project planning stage. Findings are specific to the tested structural configurations, Korean cost standards, and standard fire exposure assumptions.
No takes yet. Share an insight, caveat, or question.
Yoo et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: