Answers are grounded in this paper and cite their sources.
Assesses position control changes in heavy-lift vessels, indicating improved safety and precision.
Position control for heavy-lift construction vessels is crucial for safe operation during offshore construction. During the various phases of a typical offshore construction assignment, considerable changes in the dynamics of the crane-vessel system occur. Operational hazard was reported if such interchanging dynamics are not properly handled. However, to date and the best of our knowledge, no systematic control solution is reported considering multiphase offshore construction scenarios. This article proposes a switched dynamical framework to model the interchanging phases and to formulate a comprehensive position control solution for heavy-lift vessels. Stability and robustness against modeling imperfections and environmental disturbances are analytically assessed. The effectiveness of the solution is verified on a realistic heavy-lift vessel simulation platform; it is shown that the proposed switched framework sensibly improves accuracy and reduces hazard compared with a nonswitched solution designed for only one phase of the construction scenario.
No takes yet. Share an insight, caveat, or question.
Ye et al. (2020) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: