The use of link slab (LS) made of Engineered Cementitious Composite (ECC) in the construction of joint-free bridge deck can meet structural performance requirements and enhance durability to minimize life cycle costs. Studies documented in the literature to date have been limited to composite steel-concrete I-deck girder bridges despite their commonly used reinforced concrete (RC) girder counterparts in construction. This paper deals with two span full RC deck girder joint-free bridges with ECC link slab (ECC-LS) constructed and tested under static and fatigue loading up to 1,000,000 cycles at 4 Hz subjected to mean stress level of 40% of girder ultimate load, followed by post-fatigue static loading to failure. Residual load, deflection, moment, rotation, stiffness, and energy absorbing capacity of fatigued bridge specimens are compared with its virgin (non-fatigued) counterparts to assess structural performance. Experimental moment capacities are compared with those obtained from existing analytical equations. The comparative performance of joint-fee bridge with RC deck girder is compared with its composite steel-concrete I-girder counterpart to assess its feasibility of construction.
No takes yet. Share an insight, caveat, or question.
Hossain et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: