Demonstrates improved cost prediction in construction projects, indicating significant advancements.
Accurate early stage construction cost prediction is essential for project budgeting, financial planning, and strategic decision making. However, reliable estimation remains difficult because early project information is limited, heterogeneous, and strongly interdependent across design conditions, project characteristics, and market context. Conventional statistical and machine learning methods usually represent these factors as unordered tabular inputs and therefore have limited ability to capture their hierarchical organization and high order dependencies. To address this issue, this study proposes an adaptive hypergraph learning framework for actual construction cost prediction. First, a prior hierarchical hypergraph is constructed to encode cost factors and their domain-informed relationships across design information, project characteristics, and economic indicators. Second, an adaptive hyperedge refinement mechanism is introduced to modulate relation strength according to project context, enabling the learning framework to preserve expert knowledge while learning project-specific structural variation. Third, a confidence-calibrated aggregation mechanism is designed to estimate latent factor reliability and calibrate feature aggregation during hypergraph learning. To avoid interpreting this internal reliability mechanism as full probabilistic uncertainty quantification, an additional prediction interval analysis is introduced to evaluate interval coverage and width under heteroscedastic cost ranges. Experiments on a real-world dataset of 50 school projects using 5-fold cross-validation show that the proposed method achieves a MAPE of 10.94 ± 1.02% , an MAE of 15.12 ± 2.18 million HKD, an RMSE of 19.46 ± 2.41 million HKD, and an R² of 0.57 ± 0.06 . Compared with strong tree-based ensemble baselines, including Random Forest, XGBoost, and LightGBM, the proposed learning framework achieves moderate but consistent gains. In addition, when the proposed training strategy is applied to existing neural and graph-based predictors, it improves both point prediction accuracy and prediction interval quality compared with alternative training strategies. The framework also provides interpretable insights into both factor importance and learned relation usage. These results indicate that integrating hierarchical factor organization, adaptive structural learning, and confidence-calibrated representation learning offers an effective direction for early stage construction cost prediction under small-sample conditions.
No takes yet. Share an insight, caveat, or question.
Zhao Lilong (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: