Randomized trial assesses utility as-built data formats impact on construction projects, suggesting improved decision-making tools.
Inaccurate, incomplete, or outdated utility as-built data significantly hinder underground infrastructure projects, resulting in delays, increased costs, and safety risks. The reliance on paper-based processes for utility documentation further exacerbates these challenges, often resulting in poor-quality as-built data. Recognizing the substantial value of collecting better quality as-built information to enhance planning, improve design, expedite construction, and reduce costs, this study explores the impact of various utility as-built data formats on transportation projects. The objective of this research was to establish the hierarchical relationship among the identified factors (related to utility as-builts) to determine their level of influence/criticality through interpretive structural modeling (ISM) in construction projects. Furthermore, using cross-impact matrix multiplication applied to classification (MICMAC) analysis, these factors were classified into four categories based on their driving and dependence power. At the end, a survey of state DOTs was conducted to identify the impact of different types of utility as-built data formats on construction projects. The findings illustrate that technical factors, such as utility investigation, positional accuracy/data quality, and the type of utility as-built data format, have a greater influence on construction projects, further affecting operational and decision-related factors like utility coordination, utility risk assessment, and conflict resolution, which ultimately influence overall project cost. The research contributes to developing a framework that models the interdependencies among these factors, providing a decision-making tool for assessing the value of the utility-as-built data format and further guiding the selection of an appropriate data collection format to make an informed choice based on its recognized impact on construction projects.
No takes yet. Share an insight, caveat, or question.
Patel et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: