Answers are grounded in this paper and cite their sources.
Investigates pneumatic slag discharge efficiency in borehole-protection drillpipes, suggesting enhancements for safe drilling.
Short drilling distances in soft coal seams prone to gas outbursts are mainly caused by drillpipe jamming from the accumulation of drill slag. This poses a gas hazard and limits gas utilization. A novel borehole-protection and pressure-relief (BPPR) drillpipe with three channels is proposed to solve this problem. However, the structural principle of the BPPR drillpipe differs significantly from that of conventional drillpipes, and the migration mechanisms of drill slag and airflow inside the borehole remain unclear. In this paper, the migration behavior of drill slag and its influencing factors during BPPR drillpipe drilling were investigated based on mechanical analysis and CFD-DEM coupling simulations. The results show that when air velocity exceeds the minimum suspension velocity of slag, the slag entering through sieveholes can be smoothly discharged by airflow. Small vortices form at the sieveholes but do not block slag discharge. The key factors affecting slag discharge are air velocity, slag volume, and particle size. Higher air velocity increases the slag transport speed and discharge rate. A larger slag volume reduces the average transport speed at the same air velocity. Larger particles need greater air velocity, or they settle at the bottom. Drillpipe rotation speed has little effect on slag transport. To ensure effective slag discharging, air pressure and velocity should be increased. In addition, the sieveholes on the BPPR drillpipe surface can regulate the slag volume and particle size entering the inner discharge channel. This matches the slag load with the airflow capacity and prevents blockages in the inner discharge channel.
No takes yet. Share an insight, caveat, or question.
Ding et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: