Answers are grounded in this paper and cite their sources.
Tests a new method for tractable trajectory planning in tower cranes, improving load positioning and safety.
In complex environments, tower cranes not only need to efficiently transport loads to specified target points but also must avoid obstacles present in their surroundings. This poses a significant challenge for the load positioning control of tower cranes. To tackle this problem, an accurate model-based approach is developed for trajectory planning and tracking control, enabling both obstacle avoidance and precise load positioning during the crane’s lifting process. Specifically, the paper formulates smooth parameterized load trajectories in the tower crane task space using piecewise Bézier curves. The positions of curve control points are designed to allow independent adjustment of each trajectory segment, thus avoiding obstacles during load movement and ensuring operational safety. A novel method for defining the load swing angle is introduced, which employs the system’s differential flatness to map the smooth parameterized trajectories from the task space to the system’s generalized state space without requiring model linearization, thereby ensuring the designed trajectories’ precision and traceability. A meticulously designed high-order sliding mode controller is employed to ensure the jib and trolley accurately follow the prescribed reference trajectory, while effectively suppressing load swing angle, thereby achieving precise load positioning. Finally, the proposed control strategy was tested on a tower crane experimental platform. Experimental validation reveals that the maximum radial swing angle is limited to 3.264°, while the maximum slew swing angle reaches 3.599°, with residual oscillations reduced to 0.425° and 0.343°, respectively. Compared with conventional input-shaping methods, the maximum radial swing and residual oscillation are reduced by 72.7% and 88.9%, respectively. These results demonstrate that the designed trajectory planning and tracking control strategy enables the tower crane load to avoid obstacles smoothly and position precisely at the target point.
No takes yet. Share an insight, caveat, or question.
Ma et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: