Answers are grounded in this paper and cite their sources.
This paper addresses the unrelated parallel machine scheduling problem with limited human resources. Firstly, the formulation of a Mixed Integer Linear Programming (MILP) model for optimally solving the problem is provided. Then, a proper genetic algorithm (GA) is presented aiming to cope with larger sized issues. Numerical experiments put in evidence how both the number of workers and the number of machines employed within the production system play a key role in minimizing makespan. Moreover, obtained results highlight the effectiveness and the efficiency of the proposed GA, under the quality of solution and the computationa l burden viewpoints.
No takes yet. Share an insight, caveat, or question.
Cappadonna et al. (2013) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: