Answers are grounded in this paper and cite their sources.
This paper reviews a number of engineering technologies and workmanships for addressing the challenging issues concerning possible landslides in large-scale slope reinforcement projects in China. It includes: (1) the multi-point anchored piles with a depth of 64 m in the Jietai Temple rehabilitation project, (2) soil nailing strengthened by driven pipe grouting technique covering an area of 530 m × 100 m (length × height) in the Xiluodu hydropower project, (3) the cantilever piles extending vertically from the slope toe to stabilize a 300 m high slope at the Xiaowan hydropower station, (4) a new and simple workmanship for building a pile with cross-sectional area of 20 m × 5 m in the Hongjiadu hydropower station, and (5) comprehensive reinforcement scheme proposed for excavation of a 530 m high slope in Jinping I hydropower station. These new technologies can provide valuable experiences for reinforcement of high slopes of similar projects in China and other regions and countries with similar geological conditions.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2016) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: